Engineers · Architects · Technicians

AI can help you with your design work.
This guide shows you how.

Calculation reports, design reports, technical documents and tenders: learn to bring AI into your projects with more than 80 practical applications.

  • 80+ practical applications for your design work, deliverables and project assignments.
  • Ready-to-use prompts to adapt to your own projects.
  • A real project, step by step, including the engineer’s corrections and decisions.

English edition in preparation.
By Amos Houewatonou · No programming experience required.

THE PRACTICAL GUIDECONSTRUCTION / AI
Fictional roads and utilities plan on the work table3D concept illustration of buried servicesCover of AI for Architecture and EngineeringFROM YOUR DOCUMENTS
TO YOUR DELIVERABLES
A Practical Guide for Engineers, Architects and Technicians
METHODSPROMPTSPRACTICAL EXAMPLES
80+practical applications throughout the guide
22chapters to put AI to work
3parts, from first steps to AI agents
1real design consultancy case study

From general-purpose tools to professional workflows

ChatGPTClaudeGeminiCopilotPerplexity
Which should you choose for your construction projects?

Choose according to your task, source documents, expected outputs and working environment. Then learn to give each tool your project context and organise its contribution.

01

Choose for the task

Source research, document analysis, writing, scripts or images: assess how well a tool fits your task, file formats and requirements.

02

Adapt AI to your practice

Prepare your company information, instructions, templates and project documents in an environment approved by your organisation.

03

Make the tools work together

Allocate tasks, share sources and assumptions, and compare proposals. Agreement between several tools is not professional validation.

04

Define your agents and review process

Set the task, expected outputs and professional checks: sources, units, assumptions, revisions and decisions requiring approval.

The workflow illustrated · A plan, a 3D view, a section

See how to turn project documents
into a tangible result.

Starting with a roads and utilities plan, prepare a 3D illustration to explain buried services and communicate your design. The guide shows you what data to provide, how to write your instructions and what to check.

01 · The starting planRoads and utilities · fictional project
Fictional roads and utilities plan with stormwater, wastewater, potable water, power and telecom services
02 · The AI-generated illustrationA schematic view of the buried services
Schematic 3D view of the junction and its buried services
03 · Show what happens beneath the roadConcept cross-section · complementary illustration
Concept cross-section showing pavement layers and buried services

Fictional project · AI-generated images, localised for this page. The 3D view is an illustration, not an editable BIM model. The section is indicative and has no defined cut location on the plan; dimensions and depth references require reconciliation before technical use.

Learn to do this, and much more: analyse project documents, compare bids and prepare your deliverables.

Explore the guide · €49 incl. tax

Your everyday work, supported by AI

Calculation reports, design reports, technical documents:
move your projects forward with AI.

Learn what data to provide, what to ask AI to produce and how to check its response before using it in your project.

01
CONCEPT MODEL · TWO-STOREY OFFICESSTR-DDC-01

From nodes to column loads.

N01N10N19N02N11N20N03N12N21N04N13N22N05N14N23N06N15N24N07N16N25P07 · 96 kNN08N17N26P08 · 192 kNN09N18N27P09 · 96 kNVERTICAL LOADS · Gk + Qk2 floors · q = 8.00 kN/m²GRID 2 × 6.00 m / 2 × 4.00 m · h = 3.20 mTRIBUTARY AREAS · EXCLUDING COLUMN SELF-WEIGHT
ColumnsTributary area AN = A × 8 × 2
P01, P03, P07, P096.00 m² each96.00 kN each
P02, P04, P06, P0812.00 m² each192.00 kN each
P05 · central24.00 m²384.00 kN
Total across 9 columns96.00 m²1,536.00 kN

Assumptions: two identical full floors; Gk = 6 and Qk = 2 kN/m². Tributary-area distribution excludes column self-weight, openings and horizontal actions. This is not a frame analysis or member design.

MODEL + ASSUMPTIONS + TRACEABLE RESULTS

Prepare your calculation reports

Organise assumptions, prepare calculation scripts and present results for checking and interpretation.

CALCULATIONS · ASSUMPTIONS · RESULTS
02
IMAGE OBSERVATIONS · SIMULATIONDIA-F03

Crack at a window corner — observe and comment.

AI-generated photographic simulation of a diagonal crack above a windowF-03E-01
ReferenceDraft observation
F-03Diagonal trace from the upper right-hand corner of the window opening.
E-01Local chipping and deterioration of the render along the trace.
Record on siteCrack width, length, continuity into the substrate and changes over time.
InvestigateConstruction details, moisture, history and monitoring.

AI-generated image, fictional scenario. An image alone does not establish the cause of a crack or whether it is active.

Write your design and investigation reports

Turn surveys, observations and results into a structured report: diagnosis, analysis, conclusions and recommendations.

DIAGNOSIS · REPORTS · RECOMMENDATIONS
03
DESIGN OFFICE · FICTIONAL TWO-STOREY OFFICESTEC-COMP-004 · REV. A

Floor system — comparing options

CriterionRC slabComposite solution
Reference span6.00 m6.00 m
Concept thickness0.20 m0.13 m + beams
Self-weight per unit area0.20 × 25 = 5.00 kN/m²Manufacturer’s data required
Interfaces to reviewService openings · downstand beamsConnectors · fire · acoustics
Cost informationConcrete + reinforcement + formwork quantitiesDecking + concrete + structural steel quantities

Weight and performance data for the composite solution are missing: the comparison remains open.

DECISION TO PREPARE: complete the data before selecting an option.
COMMON BASIS · same grid and use, explicit assumptions

Build your technical notes

Explain a solution, compare alternatives and prepare a justification supported by project data.

OPTIONS · ANALYSIS · JUSTIFICATION
04
DESIGN OFFICE · FICTIONAL TWO-STOREY OFFICESSPEC-03 · § 3.4.2 · REV. B

Slab over ground floor — RC works

3.4.2.1 — Scope of works
Solid slab in zone A1–B3, geometry as shown on formwork drawing STR-102-B. Nominal thickness: 0.20 m. Service openings must be coordinated with the building services coordination drawings.

3.4.2.2 — Data to confirm
Concrete grade, exposure class, cover and fire resistance requirements: confirm against the calculation report and approved documents. No values are assumed by default.

Related documentConsistency check
STR-102-BExtent, levels and thickness
SYN-102-BOpenings and interfaces
PRICE SCHEDULE · 03.04Unit, quantity and included scope
SPECIFICATION · illustrative extract to complete and coordinate

Prepare specifications and tender documentation

Draft specifications for each work package and cross-check them against drawings, quantities and scope boundaries.

SPECIFICATIONS · TENDER DOCUMENTS · CONSISTENCY
05
FORMWORK PLAN + QUANTITY TAKE-OFFQTO-D01

From dimensioned plan to traceable quantity.

6.006.0012.00 m4.004.008.00 m123ABCD01 / thickness 0.20O012.00 × 2.00NET AREA = 92.00 m²SLAB OVER GROUND FLOOR · STR-102-BFICTIONAL EXTRACT · CAD-STYLE VIEW
Reference / itemCalculation detailQuantity
D01 · gross footprint12.00 × 8.0096.00 m²
O01 · opening−2.00 × 2.00−4.00 m²
D01 · net concrete92.00 × 0.2018.40 m³
Net soffit area96.00 − 4.0092.00 m²

Geometric take-off for the slab only, excluding beams and downstands; opening O01 is deducted once. CAD-style preview drawn for this fictional example, with no source DWG file.

Prepare quantity take-offs and estimates

Use spreadsheets and BIM exports to organise quantities, prepare estimates and investigate differences.

BIM · QUANTITIES · ESTIMATES
06
DESIGN OFFICE · FICTIONAL TWO-STOREY OFFICESREVIEW-OBS-007 · REV. A

Opening R17 — review comment sheet

ItemDocument / information
Structural construction drawingSTR-EXE-102-B · opening 300 × 200 mm
Building services drawingCVC-EXE-102-C · duct 400 × 250 mm
ObservationBare duct section exceeds the opening size
Further information requiredInsulation, installation clearance, penetration detail and level
OBS. V-07 · Coordinate the route with the HVAC and structural designers before updating the formwork drawing.

Status: response pending. Increasing the opening requires a structural review.

DOCUMENT REVIEW · draft comment for professional review and approval

Prepare document reviews and technical assessments

Review construction documents and bids, identify discrepancies and organise your comments.

DOCUMENT REVIEWS · BIDS · COMMENTS

Fictional illustrative scenarios: a 3D concept model and tributary-area calculation, an AI-generated crack image, and a formwork view prepared for a take-off. These are not construction-ready designs or reproductions of book pages.

Develop your business · Prepare your next appointment

Find the right tender opportunities.
Build a persuasive response with AI.

From opportunity monitoring to the technical proposal, structure your approach to select relevant projects and address the client’s requirements.

FICTIONAL TENDER · DESIGN SERVICESAO-26-014

Refurbishment of an occupied office building.

OPPORTUNITY ASSESSMENT · CONDITIONAL GO
Decision pointScenario findingsNext action
ExpertiseArchitecture, structures, HVAC, power and low-current systemsConfirm HVAC partner
Track recordTwo comparable projects identifiedVerify scope and reference evidence
ResourcesProposed project managerConfirm workload over the project period
ConstraintsOccupied site · phased worksPrepare methodology and interfaces
Conditional GO: confirm the HVAC partner and the project manager’s availability before committing.

Fictional sources: tender instructions § 4 · project brief § 2.3 · reference sheets · resource schedule.

TECHNICAL PROPOSAL · RESPONSE STRUCTUREMT-01 · REV. A

From evaluation criteria to evidence.

Fictional tender criterionResponse to developSupporting evidence
Methodology · 30%Diagnosis, occupied-site phasing, coordinationProgramme + phasing diagram
Team · 20%Roles, availability and interfacesOrganisation chart + relevant CVs
Environment · 10%Method for comparing design optionsIndicator matrix
Price · 40%Consistency between workload, fees and scopeFee breakdown
PRE-SUBMISSION CHECK: address every criterion, substantiate every commitment and invent no project references.

Fictional example · Weightings apply only to this scenario.

01

Tender monitoring

Define the assignments you want and prepare a summary of opportunities to assess.

02

Document analysis

Identify required expertise, deliverables, selection criteria and deadlines.

03

Go / No Go

Compare requirements with your track record, resources and availability before deciding to bid.

04

Qualification submission

Organise project references, team profiles and supporting documents.

05

Technical proposal

Build a tailored response: understanding of the assignment, methodology, team, organisation and programme.

06

Pre-submission review

Cross-check your response against the tender requirements and list items to correct or complete.

Look inside before you decide

80+ practical applications
for your construction projects.

Explore English working adaptations of six examples from the 30 practical worksheets: inputs, prompt, expected output and professional checks.

English working adaptations based on French manuscript examples, with source illustrations and new schematic visuals. These are editorial previews, not pages from a completed English edition. Final wording, illustrations and pagination may change.

Real projects, real contradictions

Follow the use of AI
on a real design consultancy assignment.

The refurbishment of a workplace restaurant for a local authority in the Île-de-France region: a site partly in use, conflicting source documents and changing assumptions.

Read the full case study in Chapter 22.

  • What the engineer asks

    The instructions, source documents and context given to the agent.

  • What AI produces

    Proposals checked against project documents and requirements.

  • What the engineer corrects and decides

    The errors, rejected proposals and trade-offs that form part of real project work.

An anonymised case study documented in the book, including the limitations encountered.

A guide to use throughout your projects

From your first AI request
to your own project agents.

Three parts to establish your method, apply it to design work and organise your agents.

01

Get your first applications right

Understand the tools, protect your data, organise a project and prepare your first outputs.

View the 5 chapters
  • What AI really changes in your work
  • How AI works
  • The three rules that protect you
  • Your first project with AI
  • Diagrams and images
02

Deliver your project assignment

Existing-condition assessment, design, estimating, tender documents, bid assessment, document reviews, changes, handover and as-built records.

View the 11 chapters
  • Starting the assignment
  • Diagnosis and existing conditions
  • Concept design and the project brief
  • Preliminary design: calculate and compare
  • Rechecking compliance when the project changes
  • Costing the design
  • Producing consistent tender documentation
  • Tendering and bid assessment
  • Reviewing construction documents
  • Managing changes during design and construction
  • Handover and as-built documentation
03

Organise your practice with AI agents

Prepare company information, configure a project agent and develop your tender responses.

View the 6 chapters
  • Recording your company information
  • The project agent: one agent per assignment
  • Winning project appointments
  • Agents for tender responses
  • Organising your agents
  • A real design consultancy case study

Your expertise stays in control

AI prepares.
Your expertise makes the difference.

Learn to delegate a task, verify the response and decide what to use.

  • You define the task.Specify the data, assumptions and expected output.
  • The tool prepares a draft.It proposes an analysis, text, table or file.
  • You check and decide.Return to the sources and verify anything that affects your professional work.

The author

AmosHouewatonou

Engineering · BIM · AI for construction

An approach shaped by engineering practice and business leadership.

Amos HOUEWATONOU holds two French engineering degrees — in civil engineering and new technologies applied to civil engineering — and an MBA.

A specialist in BIM and AI applied to construction, he designs and deploys AI agents for engineering consultancies and construction businesses.

He founded and leads 7Elite Group, bringing together approximately 80 people across Europe and Africa, including a design consultancy operating in Paris and internationally.

English cover of the guide

A Practical Guide for Engineers, Architects and Technicians

Put the methods to work
on your own projects.

  • A method for organising your AI environment.
  • 22 chapters, from first steps to AI agents.
  • 80+ practical applications throughout the guide.
  • A detailed case study from design consultancy practice.
€49 incl. tax
Order form
AI for Architecture and Engineering × 1€49.00 incl. taxVAT not applicable, article 293 B of the French General Tax Code

Digital book in PDF (333 pages), the prompt collection (Word and PDF) and the Excel workbooks, in a zip file. Download link valid for 7 days. Personal licence: for the buyer’s own use only.

Order with an obligation to pay:

Secure payment via PayPal. You can pay by card (Visa, Mastercard, CB) without creating an account.

PayPalVisaMastercardCB (Cartes Bancaires)

Before you get started

Is this the right guide for you?

I already use AI. What will this book add?

A method for moving from occasional requests to structured project work: choosing inputs, preparing deliverables, tracing sources, checking results and organising agents.

I am a complete beginner. Can I use it?

Yes. Part One covers the foundations and guides you through a first project. You can then turn to the chapter relevant to your assignment. No programming experience is required.

Which professions and projects does it cover?

Engineers, architects, technicians, cost consultants and CAD/BIM designers. The project workflow uses building examples, while applications also cover utilities, roads, earthworks, structures and BIM.

Is this just a book of prompts?

Each prompt comes with a workflow: what data to provide, what output to request, how to use the result and what to check. The guide also follows project stages and includes a real case study.

Do I need to buy software with the book?

The book uses conversational assistants that can work with documents and files. Software and subscriptions are not included in the book price. Required features depend on the application you want to reproduce.

How should I handle confidential project data?

Part One addresses data protection. Use an environment approved by your organisation and prepare the documents before sharing them with a tool.

How will I receive the book?

It is a digital book: a printable PDF of 333 pages, with the prompt collection (Word and PDF) and the Excel workbooks of the plates, in a single zip file. After payment you receive the download link by email. No delivery charge. The examples originate from French practice; applicable local requirements must be checked for your projects.

The practical guide€49 incl. taxView the offer

1 / 3 · From plan to 3D model

English working preview: from plan to 3D model